Quantcast
Channel: VMware Communities : Discussion List - vRealize Orchestrator
Viewing all articles
Browse latest Browse all 6251

synchronize configuration in vRO 7.1 cluster

$
0
0

Using the built-in vRO that is installed with vRA 7.1 in a 2 node cluster.

 

When I make a change via vRO Control Center (ie to the authentication provider), Orchestrator Cluster Management shows that the configuration for the two nodes is not in synch.

 

Question is, how do I initiate the synchronization?

The vRO 7.1 documentation suggests that there should be a "Push Configuration and restart nodes" dropdown menu, but for the life of me I can't find it in the Control Center.

 

One change I made seemed to eventually synchronize over a 48 hour period, so perhaps their is a scheduled synch, but would be nice to be able to synchronize at will and be done with it.

 

Appreciate any suggestions.

 

Thx

Matt


Viewing all articles
Browse latest Browse all 6251

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>